The facility, located on the Communications Research Centre Canada campus, was constructed on time and within budget, resulting in measurable long-term benefits and savings. The “state-of-the-art” facility features a range of technical innovations that meet the current standards for preservation environments and provide the required fire prevention and protection measures. The building is also equipped with small individual vaults, specialized monitoring and an exterior buffer zone of land for added security.
Project Type:
- Retrofit
Installation Type:
- AHUs, Chillers
Total Area:
- 1,190 m2 (12,809 sq ft)
Equipment Installed:
- 2 MACH2
- 1 MACH-ProSys
- 2 MACH-Stat
- 23 SMART-Space Controller
Network:
- Ethernet, Fiber Optics, LAN, WAN, EIA-485
Total System Points:
- 301
Total BACnet Points:
- 143
Engineering Consultant:
- –