Royal Canadian Air Force Air Mobility Training Centre at 8 Wing/CFB Trenton

  • GOVERNMENT

8 Wing at Canadian Forces Base (CFB) Trenton is the hub of Royal Canadian Air Force air mobility operations in Canada. With fleets of tactical and strategic transport aircraft, 8 Wing/CFB Trenton delivers supplies to the high Arctic; airlifts troops, equipment, and humanitarian loads worldwide; and is home to the Joint Rescue Coordination Centre. Members of 8 Wing are involved in virtually every Canadian Armed Forces operation. The Air Mobility Training Centre at 8 Wing was built to house the equipment and personnel used to train pilots and maintenance crews for the CC-130J Hercules aircraft

Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image

Authorized Dealer R.E.L. Controls installed a Reliable Controls building automation system during construction of the Air Mobility Training Centre.

The size of two football fields, this LEED Silver–certified facility includes two- and three-story educational and office spaces designed to accommodate high-tech aircrew and technician simulation, making it one of the most advanced flight-training
facilities in the world.

Installed mechanical equipment includes chillers, boilers, lights, power monitors, fire alarms, an emergency generator, a domestic hot water system, chemical control, and variable frequency drives. The project required compliance with military standards and
integration of third-party equipment.

The complex training equipment housed in the Air Mobility Training Centre meant the tolerances for the concrete floors were lower than normal. With the Reliable Controls building automation system, facility managers benefit from remote access integration to a wide area network that spans multiple buildings as well as creative programming for energy-saving modes. R.E.L. Controls was awarded the BACnet International Annual Award for BACnet Project of the Year in 2017 for its work on the 8 Wing/CFB Trenton Air Mobility Training Centre

Interested in Reliable Controls technology for your next project? Find an Authorized Dealer near you:

reliablecontrols.com/sales

Explore other Reliable Controls projects:

reliablecontrols.com/projects/profiles

PROJECT BREAKDOWN

  • PROJECT TYPE

    New construction

  • MARKET SEGMENT

    Government

  • INSTALLATION TYPE

    HVAC

  • TOTAL AREA

    17,000 m2 (183,000 ft2 )

  • PROTOCOL

    BACnet

  • Equipment InstalleD

    303 MACH-Air™ controllers
    2 MACH-ProAir™ controllers
    4 MACH-ProCom™ controllers
    21 MACH-ProSys™ controllers
    47 MACH-Zone™ controllers
    241 SMART-Sensor™ LCD devices
    51 SMART-Space™ Controller devices

  • Total Objects

    10,579

  • CERTIFICATION

    LEED Silver

  • Reliable Controls Authorized Dealer