The Canadian Forces Land Advanced Warfare Centre will be the home of the parachutist army unit at the south side of the base. CFLAWC’s is a school for parachute and army training.
Project Type:
- New Construction
 
Installation Type:
- VAV, CO2, Chillers, Boilers, AHUs
 
Total Area:
- – m2 (- sq ft)
 
Equipment Installed:
Network:
- Ethernet, Fiber Optics, LAN, WAN, EIA-485
 
Total System Points:
- –
 
Total BACnet Points:
- –
 
Engineering Consultant:
- MCW
 







