The Canadian Forces Land Advanced Warfare Centre will be the home of the parachutist army unit at the south side of the base. CFLAWC’s is a school for parachute and army training.


Project Type:

  • New Construction

Installation Type:

  • VAV, CO2, Chillers, Boilers, AHUs

Total Area:

  • – m2 (- sq ft)

Equipment Installed:

Network:

  • Ethernet, Fiber Optics, LAN, WAN, EIA-485

Total System Points:

Total BACnet Points:

Engineering Consultant:

  • MCW