This four storey building is one of three lodges and was the latest to be built. This building a hotel like building for members of the armed forces requiring temporary digs. The building is made up of rooms with washrooms that are controlled by heat pumps with a local thermostat and controllable via BACnet.
Project Type:
- New Construction
Installation Type:
- AHUs, Heat pumps, CO2 monitoring
Total Area:
- – m² (- ft²)
Equipment Installed:
- 1 MACH-ProSys
- 3 MACH-ProPoint I/O
- 10 MACH-ProCom
- 1 MACH-ProZone
- 1 MACH-Air
- 29 SMART-Space Controller
Network:
- Ethernet, Fibre Optics, LAN, WAN, EIA-485
Total System Points:
- –
Total BACnet Points:
- –
Engineering Consultant:
- Appin